Berlin, 10 February 2025 – Bayerischer Rundfunk featured terralayr on TV
Bayerischer Rundfunk recently accompanied us during the grid connection day of our large-scale battery storage system in Tittling in Bavaria. 🔋🔌
Our colleague Matthias Thesing was live on site to oversee the event and shared some insights on why we need (more) batteries, and what it takes to bring a BESS site to live.
The TV, radio and web reports produced give an insight into our work. Watch it here.